Russian Journal of Transport Engineering
Russian journal of transport engineering
           

2017, Vol. 4, No. 4. - go to content...

Permanent address of this page - https://t-s.today/en/07ts417.html

Метаданные этой статьи так же доступны на русском языке

DOI: 10.15862/07TS417 (https://doi.org/10.15862/07TS417)

Full article in PDF format (file size: 928.6 KB)


For citation:

Levkovich T.I., Miladinov S.A., Mashchenko T.V., Konovalov D.S. [Evaluation of possible causes of destruction of the bases of highways] Russian Journal of Transport Engineering, 2017, Vol. 4, No. 4. Available at: https://t-s.today/PDF/07TS417.pdf (in Russian). DOI: 10.15862/07TS417


Evaluation of possible causes of destruction of the bases of highways

Levkovich Tatiana Ivanovna
Bryansk state engineering-technological university, Russia, Bryansk
Е-mail: tilevkovich@mail.ru

Miladinov Segedin Alaudinovich
Bryansk state engineering-technological university, Russia, Bryansk
Е-mail: zelgedinm@yandex.ru

Mashchenko Tatiana Vladimirovna
Bryansk state engineering-technological university, Russia, Bryansk
Е-mail: mashenko.tania@yandex.ru

Konovalov Dmitry Sergeevich
Bryansk state engineering-technological university, Russia, Bryansk

Abstract. Of great importance in road construction in areas that do not have their natural resources of stone materials, is paid to the use of local materials. Such materials include soil. During the construction of the bases of roads (sites) in the soil to enhance organic, inorganic and complex binders. When strengthening soils, special attention should be given not only to the quality of the materials used, but the quality and execution of road construction works. Built the base using the binder of the first type (cement) necessary to maintain to set the design strength in favorable heat-and-humidity mode. Studies have shown that the cause of the destruction of the foundations of reinforced soil and sand-gravel mixture was a violation of technological process in their construction – insufficient mixing mill road.

Also the contractor was not held sufficient care for the layers reinforced soil and sand-gravel mixture. Not been made a cover layer of film-forming material – bitumen emulsion, bleached with lime. The customer manifest neglect of built layers of reinforced soil and sand-gravel mixture. The customer to set the strength of the base roads were open to traffic of heavy transport.

Keywords: soil; binder; cement; durability; quality control of road construction works; the volume works; the study of the causes of destruction

Download article in PDF format

Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 License.

ISSN 2413-9807 (Online)

Dear readers! Comments on articles are accepted in Russian and English.
Comments are moderated and appear on the site after verification by the editor.
Comments not related to the subject of the article are not published.

Добавить комментарий